Client: Park Communications
Service provided: project management and cost consultancy


Park Communications Ltd (PCL) are required to relocate their business under a Compulsory Purchase Order from their existing location at Lea Mill to the proposed new premises outside.

The client operates a printing business 24/7 and the new units require extensive refurbishment and remodelling. The extent of the modifications include but is not limited to the following: new entrance area; floor strengthening; new lift; new and refurbishment of toilets; construction of mezzanine floors to pre-press and digital areas; new escape staircase; removal of blockwork dividing walls between units; upgrade Unit 3 to comply with current building regulations; provide corporate signage, new pallet storage bays; new sanitary ware, electrical, mechanical, ventilation, heating, fire prevention, security and access systems; fit-out of 3no. units; provide client furniture; and decorate throughout.

pcm have assembled a design team and appointed a number of consultants on a sub consultant basis. We are providing Project Management, Quantity Surveying and using pcm safety for planning supervisory services.

The project involves significant M&E installations with controlled environments for storage and printing operations, also creating and fitting out of office space, all to comply with current Building and DDA regulations.

What our clients say..

Very proactive in the solutions of challenges that arise during the project. Their work was both conscientious and accurate.

Sheffield Teach Hospital logoMark Hattersley
Sheffield Teaching Hospitals NHS Foundation Trust